Hangzhou Xiaoshan International Airport Phase III
  • Region
    Zhejiang
  • Project location
    Hangzhou Xiaoshan Airport
  • Year of Completion
    2022
  • Floor Space
    720000㎡
  • Curtain wall type
    Aluminum plate, glass curtain wall

Using the product

JS-8000,JS-2000

Project Introduction

The Hangzhou Xiaoshan International Airport Phase III project is the largest airport construction project in Zhejiang Province to date, with the core projects being the construction of a new terminal (T4) and a landside transportation center terminal. After the completion of T4, the total construction area is about 720000 square meters, while the areas of T1, T2, and T3 are 98000 square meters, 96000 square meters, and 168000 square meters, respectively. This means that there will be greater opportunities for passenger value in the future and new breakthroughs in airport passenger throughput.
After the project is completed and put into operation, the annual passenger throughput capacity of Hangzhou Airport terminal will jump to 90 million people, and the cargo and mail throughput capacity will reach 3.6 million tons, becoming the second largest aviation hub in East China after Pudong Airport.
The main construction contents of Hangzhou Airport Phase III Project include Terminal 4, landside traffic center, Dongsan vertical connecting taxiway, eastern cargo terminal, etc. The new construction area is 1.5 million square meters, and the total investment is 27.07 billion yuan.